Standby Generator Installation in Pinecrest, FL

Keep the lights on in the next outage. We connect you with a licensed local installer. Free estimate, no obligation.

Choose what stays on in an outage. Size a standby generator for your home

Circuits you’d keep running in an outage
Running load 11.2kW

Typical unit for this: 14 kW

A rough illustration using typical running loads plus headroom for A/C start-up. It is not a load calculation; that happens at your house.

When a storm knocks out power in Pinecrest, a standby generator keeps your home running. We connect you with licensed local installers who size, install and maintain them, so the lights, air conditioning and fridge stay on while the neighborhood waits for the grid.

Power that stays on when the grid goes out

Standby Generators Pinecrest is a referral service for standby power. We connect homeowners in Pinecrest, Coral Gables, Palmetto Bay, South Miami, Kendall and Cutler Bay with licensed electrical and gas contractors who do the load calculation, the install and the final test. We don't do the installation, and your contract is with the installer.

Pinecrest’s heavy tree canopy is the first thing to come down in a storm, and when branches take out the lines along Pinecrest Parkway or 67th Avenue, the house can go dark. A standby generator starts on its own, so the air conditioning, the fridge and the lights keep running while the grid is repaired.

What a standby generator does for your home

One-line diagram: utility power and the generator both feed the automatic transfer switch, which feeds your home's panel. Utility Generator Transferswitch Yourpanel
Throw the switch at the top of the page and watch the feed move.

A standby generator is a permanently installed unit connected to your gas supply and wired to your electrical panel through an automatic transfer switch. When the power goes out, the switch senses it, starts the generator and moves your home onto backup power in seconds ; when utility power returns, it switches back and shuts the generator down. You do not have to drag out a portable unit or run extension cords through the house.

A whole-home unit powers the full house, including air conditioning, water heater, oven and laundry. A smaller unit covers one zone and the essentials: the fridge, lights and medical equipment. A licensed installer sizes the generator to the things you want to keep running and tells you what the unit can and can't run.

How the referral works

What Does a Standby Generator Cost?

Every home is different, so these are typical ranges for installed, permitted jobs in our area, not a quote. The installer's written price comes after a site visit and a load calculation, and it covers the unit, the transfer switch, the fuel connection, the pad, the permits and the inspection.

JobTypical installed range
Most standby generator installs$11,000-$22,000
Whole-home systemsTypically $19,000-$28,000
Generac 22kW air-cooled, installedAbout $11,000-$16,000
Cummins 20kW, installedAbout $9,000-$14,000
Full range, small to large homes$8,000-$40,000+

Ranges are based on published South Florida contractor pricing from 2026. Larger homes with two air conditioners, a pool pump and a long gas run sit at the top of the range; smaller essential-circuit systems sit at the bottom.

How Long Does It Take?

6-10weeks, visit to tested system

From the first site visit to a tested system, most jobs run about 6 to 10 weeks. The on-site work itself is quick: a day or two. The permits take the longest, and that part depends on the village and county schedule.

  1. Site visit and load calculation

    1 to 2 hours

    The installer visits, measures the real load, checks the panel and gas supply, and picks the spot for the unit.

  2. Written price and equipment order

    1 to 4 weeks

    You get the price in writing. Once you approve, the installer orders the unit.

  3. Permits

    2 to 6 weeks

    Electrical and gas permits with the village and county. The Village of Pinecrest’s own instructions say permit processing can take up to 30 working days, so this is the step that sets the schedule.

  4. Concrete pad

    day 1

    A reinforced slab, set and anchored to code.

  5. Gas, electrical and transfer switch

    day 1 to 2

    The unit is set, the fuel line and transfer switch are connected, and the gas work is pressure tested.

  6. Inspection and startup

    sign-off

    The inspector signs off, then the installer tests the whole system under load with you there.

What a Proper Install Looks Like

  • Sized to your home, not a guess

    A real load calculation at your home, sized to what you want to keep running: air conditioning, water heater, kitchen and pool equipment. A size quoted over the phone is a guess.

  • Permits pulled by the installer

    Generator installs in Miami-Dade need electrical and gas permits and inspections. The licensed installer should pull them; if someone suggests skipping them, get another quote.

  • Tested under load at handover

    Ask for a full test under load before handover, so you know the system works before the next storm, not during it.

  • Maintained after the install

    A generator that never runs is a generator that fails when you need it. Plan on service at least once a year, and twice a year in South Florida.

Standby Generator Questions

How do I know what size generator my home needs?

It depends on your air conditioning, water heater, range, pool equipment and anything medical. The installer does a load calculation at the house. The calculator on our home page gives a rough idea, but it isn't a load calculation.

Who installs the generator?

A licensed local contractor. Standby Generators Pinecrest is a referral service: we connect you with the installer, and they size, quote, permit and install the system. Electrical work needs a Florida-licensed electrical contractor, and gas work needs a licensed gas or plumbing contractor. Your contract is with them.

Does a standby generator need a permit?

Yes. Installs in Miami-Dade need electrical and gas permits and inspections, from the city or village or, in unincorporated areas like Kendall, from the county. The licensed installer applies for them.

How long does an installation take?

About 6 to 10 weeks from the first site visit to a tested system. The on-site work takes a day or two; permits take the longest.

What fuel does a standby generator use?

Natural gas where there is a gas main on the street, or propane from a tank, often buried, where there isn't. Many homes in south Miami-Dade have no gas main, so propane is common.

Do I pay you anything?

No. The call and the referral are free. The installer may pay us a referral fee, explained on our Referral Marketing Disclosure page. You pay only the installer you hire.

Contact Us Today for a Free Estimate

Call 786-589-9026 or request a free estimate. No obligation.

Call 786-589-9026Get a Free Estimate

Free , no obligations